Yayınlanmış 1 Ocak 2018
| Sürüm v1
Dergi makalesi
Açık
Consideration of Network Constraints in the Turkish Day Ahead Electricity it Market
Yazarlar/Oluşturanlar
- 1. TUBITAK MRC Energy Inst, Elect Power Technol Branch, METU Campus, TR-06800 Ankara, Turkey
Açıklama
This paper proposes a new model for the Turkish Day Ahead Electricity Market including network equations. The existing one does not implicitly consider the power flow limitations, and these are considered separately that might result with a suboptimal day-ahead schedule. The dc network equations are added to the model, which is used to determine the Day Ahead System Sell and Buy Decisions and System Marginal Price in day-ahead planning. The impact of integration of network equations is exhibited using a small 6-bus network, mid-sized Turkish northwest sub-system, and full Turkish electric power system.
Dosyalar
bib-d21a8574-f7e9-46e1-8fe3-11d1f4277048.txt
Dosyalar
(182 Bytes)
| Ad | Boyut | Hepisini indir |
|---|---|---|
|
md5:a6324a8b8ad4cc7dda88f884c65eab3b
|
182 Bytes | Ön İzleme İndir |