Yayınlanmış 1 Ocak 2009
| Sürüm v1
Dergi makalesi
Açık
Production control with backlog-dependent demand
Yazarlar/Oluşturanlar
- 1. MIT, Dept Mech Engn, Cambridge, MA 02139 USA
- 2. Koc Univ, Grad Sch Business, Istanbul, Turkey
- 3. Gordon Coll, Dept Math, Wenatchee, MA 01984 USA
Açıklama
A manufacturing firm that builds a product to stock to meet a random demand is studied. Production time is deterministic, so that if there is a backlog, customers are quoted a lead time that is proportional to the backlog. In order to represent the customers' response to waiting, a defection functionthe fraction of customers who choose not to order as a function of the quoted lead timeis introduced. Unlike models with backorder costs, the defection function is related to customer behavior. Using a continuous flow control model with linear holding cost and Markov modulated demand, it is shown that the optimal production policy has a hedging point form. The performance of the system under this policy is evaluated, allowing the optimal hedging point to be found. [Supplementary materials are available for this article. Go to the publisher's online edition of IIE Transactions for the following free supplemental resource: Appendix].
Dosyalar
bib-91bab3e4-0852-4432-a4f9-a1613be740af.txt
Dosyalar
(126 Bytes)
| Ad | Boyut | Hepisini indir |
|---|---|---|
|
md5:4dc919d720b0efff55860f071463e11b
|
126 Bytes | Ön İzleme İndir |